Hole Geometry & Feed Rates

Total Batch Production Time
1 hr 18 min
Cycle Time per Part
1 min 34 sec
Single Hole Cycle Time
11.3 sec
Hourly Production Rate
38.2 parts / hr
Estimated Machining Cost
$124.10 ($2.48/ea)
Single Hole Travel & Time Breakdown400 total holes
Calculated Drill Point Tip Length:3.00 mm
Total Z Travel (Depth + Point + Breakthrough):31.50 mm
Pure Cutting Feed Time:9.45 s
Rapid Traverse & Peck Overhead:1.65 s
Bottom Dwell Time:0.20 s

The Drill Point Geometry Error

Standard CAM quoting often underestimates cycle time by 10% to 25% by calculating feed travel only on nominal hole depth. On through holes, the conical drill point (e.g. 3.0 mm for a 10 mm 118° drill) plus 1.0–1.5 mm breakthrough clearance must be added to total feed travel before full cylindrical diameter is achieved.

Rapid Travel & G00 Acceleration

On deep pecking cycles (G83), rapid traverse time can equal or exceed cutting feed time. Real machines require acceleration and deceleration ramps between pecks. In high-volume production, optimizing peck counts or upgrading to high-pressure through-coolant carbide can cut cycle times by over 60%.

Bottom Dwell Cost vs. Surface Finish

A 0.2 to 0.5 second dwell (P word in G82) is critical when spotting or counterboring to produce a flat, chatter-free bottom face. However, dwelling longer than 0.5 seconds work-hardens stainless steel and prematurely dulls the drill corner margins.